The photos show an oil-immersed distribution transformer. Test items, acceptance criteria and witnessing arrangements are confirmed for each model and project.
1. Verify Test Connections at the Transformer
Technicians connect the test leads to the transformer terminals and verify the connection points before measurements begin. The photo below shows the terminal connections used to prepare the unit for testing.
Test leads connected to transformer terminals before measurement.
2. Monitor Measurements at the Test Station
During testing, the operator monitors readings from the control station while technicians work in the test area. The photo below shows the monitoring station used to observe the measurements.
Control station used to monitor electrical measurements during transformer testing.
3. Review Recorded Results Before Shipment
The team reviews the recorded measurements against the technical requirements agreed for the unit. If your purchase specification includes a report or an inspection hold point, confirm the required scope and timing during the quotation stage.








Before shipment, OMEGA Transformer technicians verify test connections, monitor electrical measurements and review recorded results against the agreed project requirements. If your order requires specific tests, a report or customer witnessing, confirm those requirements with us before placing the order.
What to Send With a Transformer Testing Inquiry
Include these five items so we can review your testing requirements alongside the transformer specification.
1.Transformer type and rated capacity (kVA or MVA).
2.Primary and secondary voltages, plus operating frequency.
3.Applicable standard and any project-specific acceptance criteria.
4.Required test items and report format.
5.Customer or third-party witnessing requirements, if applicable.
For model specifications and voltage options, view all transformer products.
Can I request a factory test report for my transformer order?
Send your transformer specification and required report format with your inquiry. We’ll confirm which documents apply to the proposed unit and discuss how they can be shared.
How do I request customer or third-party witnessing for transformer factory testing?
Include the tests you want witnessed, who will attend and any inspection hold points in your inquiry. We’ll review the scope and scheduling with you before the order.
What information should I provide to confirm factory testing for my transformer order?
Send the transformer type, rated capacity, primary and secondary voltages, frequency and applicable standard. Include any required test items, acceptance criteria and report format.